2015年8月24日星期一

Installation Drawing of Deviation Switch Cover

Installation Drawing of Deviation Switch Cover

According to the location of deviation switch, please install and center the drilled cover, then put the sealing strip on the cover open point flatly according to the height of the switch box cover, then install the switch box cover with 12-Φ5 rivet.

Installation drawing of deviation switch cover .


deviation-switch-conveyor-cover-drawing

没有评论:

发表评论